The story started in Europe almost twenty years ago: Too many people, too little land and a monumental, rapidly growing, waste problem. Continuing to bury waste in landfills was no longer possible, and innovative solutions were desperately needed. A solution had to be found. Today, Europe has addressed the waste problem and Sanciflex is proud to be part of that solution.
The SANCIFLEX facility will be operational within 14-18 months from the signing of the contract to commencement of the operation, assuming local laws and requirements are in order. Erecting more than one facility at the same location reduces the overall initiation time period required.
The Sanciflex system is a superior MSW system that is...